Tuesday, September 24, 2019
Justification write up for nominating for Environment, Health & Safety Term Paper
Justification write up for nominating for Environment, Health & Safety award - Term Paper Example Central Operations is committed to creating and sustaining an accident free culture for our employees and customers, as well as the public. Each operating system is responsible for integrating EH&S considerations, aimed at minimizing and controlling potential risks and hazards, into the planning, design, construction, operation and maintenance of the companyââ¬â¢s energy delivery system and facilities. Metropolitan Transit Authority (MTA) was performing the design of the East Side Access (ESA) project, which is intended to bring Long Island Rail Road (LIRR) to the Grand Central Terminal. As part of this project, blasting was performed to break their wall adjacent to the existing steam delivery system. This blasting created vibrations below ground which damaged the steam support components. As a result of the blast, a 16â⬠steam pipe shifted and fell off the supports. Engineering, in collaboration with Operations, determined the risks, scope of work, performed stress analysis, layout, and field inspections to resolve this problem. SDE and Steam Operations made field visits, identified the potential risks, and acted urgently to maintain safety, reliability, and to restore the system. In an effort to restore the system, the team inspected the affected site and recommended installing 4 special beam guides at the pipe offsets to accommodate for unusual pipe stress. Due to limited drilling depth, as a result of city sewer pathways crossing below our structures, the guides were designed to have a special base plate and anchor bolts. Field inspections found asbestos containing material insulating the original steam pipe. The abatement crew removed the asbestos insulation, using procedure 11924-5, and prior to doing any construction work to re-align the main. They then took measurements submitting them to contracted engineers selected to begin work on the repairs. Next, our
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.